logo
منزل المنتجاتفولاذ alloy شفير

Alloy Lap Joint Flanges with Stub Ends: Flexible & Cost-EffectiveCLASS300 ASME B16.5

شهادة
الصين TOBO STEEL GROUP CHINA الشهادات
الصين TOBO STEEL GROUP CHINA الشهادات
زبون مراجعة
في تصنيف البائع الأخير ، فاز TOBO تصنيف ممتاز ، انه لامر جيد ، وسوف تستمر في التعاون.

—— البرازيل --- ايمي

أنابيب الصلب السبائك ASTM A213 T9 ، نوعية مستقرة ، سعر جيد ، serive ممتازة ، TOBO GROUP هو شريكنا جدير بالثقة

—— تايلاند --- ديف مولروي

ابن دردش الآن

Alloy Lap Joint Flanges with Stub Ends: Flexible & Cost-EffectiveCLASS300 ASME B16.5

Alloy Lap Joint Flanges with Stub Ends: Flexible & Cost-EffectiveCLASS300 ASME B16.5
Alloy Lap Joint Flanges with Stub Ends: Flexible & Cost-EffectiveCLASS300 ASME B16.5 Alloy Lap Joint Flanges with Stub Ends: Flexible & Cost-EffectiveCLASS300 ASME B16.5

صورة كبيرة :  Alloy Lap Joint Flanges with Stub Ends: Flexible & Cost-EffectiveCLASS300 ASME B16.5

تفاصيل المنتج:
مكان المنشأ: شنغهاي ، الصين
اسم العلامة التجارية: TOBO
إصدار الشهادات: ISO/TUV/SGS
رقم الموديل: الشفاه سبائك الصلب
شروط الدفع والشحن:
الحد الأدنى لكمية: 1 قطعة
الأسعار: قابل للتفاوض
تفاصيل التغليف: حالة خشبية
وقت التسليم: 31 يومًا
شروط الدفع: موني جرام، موني جرام، ويسترن يونيون، T/T، D/A، L/C، D/P
القدرة على العرض: 1000 جهاز كمبيوتر شخصي/شهر

Alloy Lap Joint Flanges with Stub Ends: Flexible & Cost-EffectiveCLASS300 ASME B16.5

وصف

Alloy Lap Joint Flanges with Stub Ends: Flexible & Cost-Effective Alignment for Special Alloy Systems

The Alloy Steel Lap Joint Flange system consists of two parts: a stub end (made of a matching or superior alloy) and a backing flange (which can be made from a less expensive carbon steel). The flange rotates freely around the stub end, enabling perfect bolt hole alignment and simplifying installation, especially in systems with limited space or requiring frequent disassembly. This design is highly economical for costly corrosion-resistant alloys.

 

Product Description:
The backing flange is a flat ring with a raised face and a low hub with a rounded bore to accommodate the stub end. It is not welded to the pipe. The stub end, which has a lap to match the flange face, is butt-welded to the pipe. The two components are assembled together before bolting to the mating flange.

Key Parameters:
The stub end and flange conform to ASME B16.9 and B16.5 standards, respectively, for dimensions. Available in all pressure classes (Class 150 to Class 1500) and sizes. The stub end material is typically a high-grade alloy (e.g., ASTM A403 WP316), while the backing flange can be carbon steel (ASTM A105).

Applications:
Ideal for expensive alloy (e.g., stainless steel, duplex, nickel alloys) or lined piping systems, as only the stub end needs to be of the special material. Perfect for systems requiring frequent dismantling for cleaning or inspection, such as food processing, pharmaceutical, and pulp & paper industries. Also used in cramped spaces where rotating the entire pipe assembly is difficult.

Advantages:
Significant cost savings by using a carbon steel backing flange with an alloy stub end. Eliminates issues with bolt hole alignment during final assembly, as the flange can be rotated freely. Reduces friction and wear on flange faces during bolt-up. Simplifies maintenance and inspection.

Functionality:
Provides a flanged connection where the sealing surface is created by the lapped stub end, while the backing flange provides the structural strength for bolting. This allows the pipe system to be easily aligned and disassembled without disturbing the welded joint between the stub end and the pipe.

Payment & Invoicing

  1. First-Time Clients: 50% advance payment, 50% balance before shipment.
  2. Strategic Clients: 30% advance, 70% payment against copy of Bill of Lading.
  3. Long-Term Agreements: 60-day credit terms available (subject to credit approval).
  4. Invoicing: 13% VAT Special Invoice provided; FORM A Certificate of Origin for exports.
  5. fication System: Laser marking includes material code, pressure rating, and flow direction arrows.
Place of Origin Shanghai, China
Warranty 3 years
Customized support OEM, ODM, OBM
Brand Name TOBO
Surface treatment Sand Blasting
Size 1/2" up to 110"
Standard ASME B16.5
Package Wooden cases
MOQ 1pcs
Delivery time 10-100 days depending on quantity

 

FAQ

1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the Alibaba certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

Alloy Lap Joint Flanges with Stub Ends: Flexible & Cost-EffectiveCLASS300 ASME B16.5 0

تفاصيل الاتصال
TOBO STEEL GROUP CHINA

اتصل شخص: Andrew

إرسال استفسارك مباشرة لنا (0 / 3000)

منتجات أخرى